The back channel is connected to the rafter directly and reinforced.
Flat roof connection to wall.
Performance of conventional roof systems and components including ceiling joist to rafter connections and roof framing to wall connections.
To install the roof wall flashing above the builder bent the top edge of the flashing into a 90 degree lip about 2 cm in width.
Hand driven and pneumatic fasteners were included in the test program.
There are several ways to gain access to the roof to wall connections in masonry houses.
Another way is to gain access to this connection when the house is being re roofed.
Retrofitting roof to wall connections in masonry houses.
For example a one story garage with a flat roof may be attached to a two story house.
Connect the water control element layer of the roof to the wall the air control element layer of the roof to the wall the vapor control element layer of the roof to the wall and finally the thermal control element layer of the roof to the wall.
See fact sheet nos.
Finally access can be gained by removing interior.
By doing this method you will have a clean finish that is connected to the wall line.
For 16 inch on center framing that means connecting four trusses at each end of the house.
Figure 1 roof wall flashing detail.
After that cut the rafters back to the wall line.
For gable end roofs the florida code requires that you start by tying down roof framing members within 6 feet of each corner.
On a two story house you can usually tie the ledger into a band joist also called a rim joist located between the floors as shown below.
Technical fact sheet no.
You can raise the patio roof up to 500 millimeters by removing the eaves fascia and gutter.
Individual connections and connections within full scale roof systems were tested to quantify potential system effects.
If the membrane is asphalt built up or modified bitumen a cant strip is typically used.
19 and 20 for rake and eave details.
The flat roofing material must go up the wall a minimum of 12 or up the wall and over the top of the wall if the wall is less than 12 high.
23 window and door installation home builder s guide to coastal construction page 2 of 3 figure 2 installation sequence for deck.
A base flashing and counter flashing are typically used.
One possible way is to gain access through the eave area which may be exposed or through the soffit which is the flat surface at the eaves that forms a sort of ceiling where the roof overhangs the exterior wall.
If attaching a patio roof to a ledger beneath the eaves does not allow for enough headroom you can set the new patio roof s rafters on the wall s top plate.
It is common for flat roofs to terminate against walls that are higher than the roof.